A modular, CE-certified printer with a ground-based track system that moves continuously between structures. Built for row housing and low-rise residential developments. Operates with a crew of four.

Built for continuous production across multiple structures

Set up once and keep printing

The BOD3 is built for high-volume, low-rise construction. Its ground-based track system runs continuously along the Y-axis — across plots, between buildings, along an entire row — so the printer moves from one structure to the next without reinstallation. One setup covers the full development.

Unlimited

Max. print length

~ 0

Downtime between buildings

Ground-based track system​

Ground-level aluminium rails extend continuously along the Y-axis. The printer travels along these between structures, repositioning in minutes.

A single installation covers multiple buildings across the same development without a crane call between prints

Ground-based track system

Ground-level aluminium rails extend continuously along the Y-axis. The printer travels along these between structures, repositioning in minutes.

A single installation covers multiple buildings across the same development without a crane call between prints

Concrete printhead

A re-engineered tangential steel nozzle that follows the direction of travel continuously, producing smooth or textured wall finishes directly from the digital model.

Layer width up to 500 mm (19.7 in), layer height up to 75 mm (3 in). Nozzle replaced via quick-release system with no tools required.

Remote operation and control

The printer is operated from any device via WiFi or ethernet through a web-based interface.

Cameras on the printhead provide live visual coverage of the print. The printer also includes a separate surveillance system mounted on the Z-axis columns.

Remote operation and control

The printer is operated from any device via WiFi or ethernet through a web-based interface.

Cameras on the printhead provide live visual coverage of the print. The printer also includes a separate surveillance system mounted on the Z-axis columns.

Full specification sheet

All specifications for the standard BOD3 configuration. Use the COBOD Configurator to size your setup before requesting a quote.

Max. Printable Area (PA)

11.91 m | 39.07 ft (X-Axis)
Unlimited (Y-Axis)
8.3 m | 27.23 ft (Z-Axis)

Max. Installation Area (IA)

16.75 m | 54.95 ft (X-Axis)
Unlimited (Y-Axis)
11.8 m | 38.71 ft (Z-Axis)

Max. Printing Speed

250 mm/s | 9.84 in/s

Layer Height

Up to 75 mm | 2.95 in

Layer Width

Up to 500 mm | 19.69 in

Recommended Operating Temperature

5 - 45 °C | 41 - 113 °F

Hose Compatibility

DN75

Max. Aggregate Size

12 mm | 0.47 in

Recommended Team

1 Printer Operator (PO), 1 Printer Operator Assistant (POA)
1 Material Operator (MO), 1 Material Operator Assistant (MOA)
(Hand-on helpers are also recommended as supporting team members)

Printer Setup Time

Depends on the printer configuration. Minimum of 6 hours

Operational Interface

COBOD Web Control Interface

Supported Browsers

Microsoft Edge, Google Chrome, Mozilla Firefox, and other browsers compatible with Windows operating systems

Network Connections

Wi-Fi or LAN

Warranty

14 months

Print with real concrete

COBOD printers run on locally sourced concrete, not pre-bagged mortar. Use standard ingredients, control your own mix, and avoid being locked into a proprietary material supply chain.

slide-16_9-182-1

THE MATERIAL

Locally sourced concrete

Print with locally sourced concrete using standard materials and aggregates up to 10 mm (3/8 in). No proprietary mixes. No material lock-in. Typical strength: 30–35 MPa (~4,400-5,100 PSI).

31

THE DELIVERY

Flexible material supply

Use ready-mix trucks or batch concrete directly on site. COBOD gives you the flexibility to work with local suppliers or control the full mix yourself.

Example projects built with BOD3

The BOD3 has been used across serial housing and large residential developments worldwide.

3DCP GROUP | DENMARK

3D Printed Student Apartments

3DCP Group printed 36 student apartments across 6 buildings of 1,654 m² (17,804 SF) in total. Print time fell from several weeks on the first building to 5 days on the last, with a 3-person crew throughout.

MODULA TIGA DIMENSI | INDONESIA

Guest Houses

Modula Tiga Dimensi printed two guest houses in Lampung, Indonesia, covering 96 m² (1,033 SF) in total. Print time fell from 9 days on one building to 6 days on the next, with the same crew throughout.

POWER2BUILD | ANGOLA

Family Home

Power2Build printed a three-bedroom family home of 180 m² (1,938 SF) in Angola, finished and ready for residents. The company is using construction 3D printing to help address a national housing deficit estimated at around three million homes.

UNIVERSITY OF FLORIDA | USA

Research and Education

The University of Florida installed a COBOD BOD3 at its Herbert Wertheim College of Engineering in Gainesville, Florida. The printer supports teaching and research across construction, materials science, data analytics, and coastal resilience, giving students hands-on experience with construction 3D printing.

Request a quote for the BOD3

Pricing starts from $400,000, with financing options available. The final cost depends on configuration of the machine and the accessories required for your project. Lead time is approximately 5 months from confirmed order to independent operation: around 3 months in production, 4 to 6 weeks shipping, and 2 to 3 weeks for installation and on-site training.

Request a quote for the BOD3

Pricing starts from $400,000, with financing options available. The final cost depends on configuration of the machine and the accessories required for your project. Lead time is approximately 5 months from confirmed order to independent operation: around 3 months in production, 4 to 6 weeks shipping, and 2 to 3 weeks for installation and on-site training.

Ready to build with construction 3D printing?

Tell us about your project or production plans, and we’ll help you find the right COBOD setup.